50W 100W 200W 300W LED Flood Light
Product feature
*The internal and external anti-seismic structure design is suitable for outdoor spot lighting.
* The irradiation angle can be adjusted.
* no thermal radiation.
*Wide range of applications.
*The protection index can reach IP65.
Product description
The LED Flood Light shell of OKES is non-rusting and corrosion-free, and is made of high-tech spraying technology and high-quality die-cast aluminum materials, and the glass surface is also impact resistant. It has good sealing performance, waterproof and dustproof. Using high-brightness LED chip, improve lighting brightness, and have energy-saving effect, it is a widely used lighting fixture.
Application
Floodlights are widely used in architectural lighting. In the exterior walls of buildings, squares, parks and other places, floodlights can play a role in lighting and beautification. Through different lighting colors and brightness, different atmospheres and effects can be created, so that people can feel the beauty and charm of the building at night.
Detials
Big power,High-brightness,low light-decay,reliable quality
Toughened glass mask,high hardness,not easy to break.
Thicker aluminum,heat disspation increased by 50%,Thickened aluminum in stripe design,heat dissipation fast increased by 50%.
Waterproof plug,effectively enhance the rainproof,so that the lamp does not water.
Adjustable support to meet lighting requirements from all angles.
Parameter list
Power |
Material |
Size(mm) |
voltage |
Surge |
Lumen |
CRI |
IP |
10W |
Aluminum+glass |
110*80 |
85-265V |
1KV |
60-70 LM/W |
≥70 |
IP65 |
20W |
130*100 |
85-265V |
1KV |
60-70 LM/W |
≥70 |
IP65 |
|
30W |
160*120 |
85-265V |
1KV |
60-70 LM/W |
≥70 |
IP65 |
|
50W |
200*150 |
85-265V |
1KV |
60-70 LM/W |
≥70 |
IP65 |
|
100W |
255*195 |
85-265V |
1KV |
60-70 LM/W |
≥70 |
IP65 |
FAQ
1. How many years is the warranty of flood lights?
All OKES products have a 2-years warranty.
2.How to ensure the high quality of the product ?
OKES has professional testing instruments and inspection process after the completion of the goods. The first sample will be inspected before mass production, and the second quality inspection will be carried out before entering the warehouse.
3.Is there a MOQ?
OKES advocate large quantities and preferential treatment, and also support small order cooperation.